Live performance results

Proof from the field. Real runs, real numbers.

1,974,067
Feet drilled
134
Wells delivered
98.97%
Tool reliability
324,000+
Ft mean time between failure
2.11
Day fastest well, Dimmit County
4.13
Day fastest well, Lea County NM
Record Run

Fastest well in Avant history

4.13 days spud to TD. When it mattered, our team delivered a record run in the 1st Bone Spring, Lea County, New Mexico. Strong execution, reliable performance, and precision where it counts.

4.13
Days, spud to TD
Performance Flyers

The numbers, straight from the runs

Real results from recent SES runs across the Permian, Delaware, and South Texas. Tap any card to open it full size.

Fifth consecutive single run vertical, curve and lateral: 10,385 feet in a single run, spud to TD in 3.38 days, 284.75 ft/hr rotary ROP, zero downhole NPT or failures, Big E Rig 7 in Maverick County, Texas for H&J Petroleum218 hours drill and complete on a single run BHA, over 10 days downhole, H&P Rig 615 for Avant Natural Resources in Lea County, New Mexico: TD 21,983 feet, curve and lateral in one run, zero BHA failuresFourth consecutive single run VCL spud to TD: 4.39 days, 11,346 feet of run distance, 247.87 ft/hr rotary ROP, Big E Rig 7 in Maverick County, TexasBack to back single run VCLs to TD for El Toro Resources, Dimmit County, 19,026 total feet
El Toro Resources, Dimmit County: spud to TD in 3.45 days, third consecutive single run VCLEl Toro Resources, Dimmit County: spud to TD in 4.58 days, 10,297 feet in one single run VCLTD Drilling Motors: 17,147 feet in a single run, Midland CountyFastest well in Avant history, 4.13 days spud to TDSuper fast curve, Lea CountySpud to TD in 2.6 days9 wells in Dimmit County, 3.22 average days9 well pad, 4.95 average days per wellLea County 8 well pad, 5.26 average daysAvant, spud to TD in 4.45 days9 days saved against plan73,753 feet drilled for Avant in a single monthAverage spud to TD of 3.51 daysNew Mexico program, 9.63 daysLea County, 7.97 daysLea County, 5.83 days spud to TDAvant, spud to TD in 5.76 daysConsistent results across programs3 well pad, 2.52 days per wellSingle run Orbit curve and lateralSingle run curve and lateral, 15,626 feetSingle run on an 8 inch DynoMax motorOne motor run, curve plus 9,100 foot lateralTD Drilling Motors, 9 VCL runsTD Drilling Motors VCL run, 19,805 feetTD motor VCL run, Weld CountyTD Motors VCL run, Martin County, 18,275 feetMean time between failure, 2026 reliability data
Straight From The Field

Follow our runs, live on LinkedIn

Rig wins, records, and directional drilling insight straight from our crews. Live drilling performance data publishes here as each program connects to our platform.

Follow on LinkedIn
Specialized Energy Services on LinkedIn
Specialized Energy Services3 days ago

Today, Specialized Energy Services pauses to honor and remember the 2,977 lives lost on September 11, 2001. We stand in gratitude for the selflessness and extraordinary courage shown by the first responders, service members, and everyday heroes who answered...

#NeverForget#PatriotDay#September11
Read the full post on LinkedIn
Specialized Energy Services on LinkedIn
Specialized Energy Services5 days ago

7 wells. 7 single-run VCLs to TD. 69,425 feet drilled. ZERO directional NPT. When you eliminate curve trips and keep the bit on bottom from surface casing straight to TD, spud-to-TD timelines drop fast. Across 7 consecutive wells in Dimmit County, TX for El...

#Oilfield#DirectionalDrilling#SpecializedEnergyServices
Read the full post on LinkedIn

Ready to Break Your Next Spud-to-TD Record?

Test Our Capabilities Against Your Current Benchmark. Send over your next well outline. We'll evaluate your curve and lateral specs and return a full performance proposal - no fluff, just raw engineering.

Request Service